Madonas novads, Mārcienas pag., Saules elektrostacijas jaunbūves Vidzemē

Madonas novads, Mārcienas pag., Saules elektrostacijas jaunbūves Vidzemē
Madonas novads, Mārcienas pag., Saules elektrostacijas jaunbūves Vidzemē

The new-build solar power plants in Vidzeme

Price

1 750 000 €

Land plot

391 200 m2

An opportunity to own an investment project with guaranteed returns - the new-build solar power plants "Mārsili" and "Aronas", located in Mārciena parish, Madona municipality.

The new-build solar power plant "Mārsili":
- The project consists of a solar power plant with a capacity of 4,88 MW.
- The solar panel inventory is designed for a voltage of 800V.
- The substation is installed and includes a 6.3MW transformer as well as a self-consumption transformer.
- The project has installed fencing and constructed access roads with turnaround areas.
- The permit of the Ministry of Economy and the technical regulations of A/S "Sadales tīkls" for the solar power plant have been obtained.

The part of the project has been developed by A/S Sadales tīkls in a separate construction plan - already implemented.
The project includes the construction of external engineering networks and engineering structures for the transfer of the electricity produced to A/S Sadales tīkls, and an operational relations agreement with the distribution network operator.
The SES construction plan provides for the construction of a 1-pc transformer substation with a nominal capacity of 6300 kVA, and connection of the adjacent power plant network to this facility.
The system is installed in accordance with the individual engineering construction rules, as an engineering structure, in accordance with the provisions of the Cabinet of Ministers Regulation No 253.

New construction of the solar power plant "Aronas":
- The project envisages a solar power plant with a capacity of 6,2 MW.
- The solar panel inventory is designed for a voltage of 800V.
- The substation is installed and includes a 6.3MW transformer as well as a self-consumption transformer.
- The project has installed fencing and constructed access roads with turnaround areas.
- The permit of the Ministry of Economy and the technical regulations of A/S "Sadales tīkls" for the solar power plant have been obtained.

The part of the project has been developed by A/S Sadales tīkls in a separate construction plan - already implemented.
The project includes the construction of external engineering networks and engineering structures for the transfer of the electricity produced to A/S Sadales tīkls, and an operational relations agreement with the distribution network operator.
The SES construction plan provides for the construction of a 1-pc transformer substation with a nominal capacity of 6300 kVA, and connection of the adjacent power plant network to this facility.
The system is installed in accordance with the individual engineering construction rules, as an engineering structure, in accordance with the provisions of the Cabinet of Ministers Regulation No 253.

Within 4-5 months, a fully constructed solar power plant is ready to go into operation.

More details on request.

Amenities

Broker image

Let's get in touch